Grant Leslie
BackHondaConnect

Honda HMI Redesign

HondaConnect

Redesigning the 4-inch round display of the Honda Rebel 500 into a community-driven, socially connected riding experience.

This is an independent redesign concept and not a collaboration with Honda.

Role
UX/UI Design
Team
Team Bravo, 8
Duration
10 Weeks
Scope
HMI + Companion App
HondaConnect HMI System Redesign

Context

The Challenge

We redesigned the HMI for the Honda Rebel 500 to be more community and new rider oriented through both new and improved features. Our mission: connecting riders in a stronger community. Our target audience: new rider and college age, female riders.

Current Honda Rebel 500 LCD cluster

Current production Honda Rebel 500 LCD cluster, starting point for the redesign.

The Vision

A Social Compass
for Motorcycles

A connected app and HMI system that turns the Rebel's cluster into a social compass for the whole ride. Before the ride, riders plan routes and find riders from the companion app. During the ride, they get real-time navigation, pack mode, and glanceable alerts on the HMI. After the ride, they can share recaps, connect with new riders, and track stats.

Four blue sky features bring this to life: Pack Mode, Request Assistance, Community Heatmap, and Bike Bump. Each lives on the HMI, the app, or both.

HMI

Pack Mode

Social compass and nav syncing across a group.

APP

Community Heatmap

Live map of nearby bikers, events, and hotspots.

HMI & APP

Request Assistance

Built in safety for quick help on the road.

APP → HMI

Bike Bump

Tap to send a friend request via NFC.

Research

Research

5

Participants

130+

Data Points

01

Physical → Digital

Interface must match handlebar input layout.

02

Glanceable Info

Critical data stays large, central, readable.

03

Simple Navigation

Turn by turn arrows, minimal menu depth.

04

Notification Hierarchy

Alerts in a dedicated status zone.

Field Research

Savannah HD field trip

Field Trip 01

Savannah HD

Riders prioritize simple, glanceable displays. Reinforced minimal distraction in HMI design.

Honda team trip

Field Trip 02

Honda Team Trip

Hands on ergonomic feel of the Rebel 500 and 1100, informing HMI placement and content.

The Disconnect

New riders face isolation, lack of confidence, and fear, while existing biker communities rely on scattered forums, word of mouth, and informal groups.

User space analysis

What Riders Said

“

I think it would be kind of cool to just pop up. They'd just go out for a ride and suddenly you appear.

Rider Interview #2

“

It can be something as simple as riding on the highway and another biker passes, and suddenly you kind of group together.

Rider Interview #4

“

I've been on rides for 70 plus people, and now I know most of them by name.

Rider Interview #5

The Opportunity

No universal, real time platform connects riders for spontaneous meetups and safety support.

How Might We

“How might we redesign the Honda Rebel 500 HMI and mobile ecosystem to transform the riding experience from a solitary mechanical task into an intuitive, community-driven journey?”

Design

User Persona

“I bought this bike for freedom, but riding alone feels lonely, and sometimes unsafe.”

Pain Points: Little Representation · Isolation Fear · The Disconnect

Goals: Confidence · Connection · Content

Jenna Smith · 23 · Barista · 5 months riding

User persona, Jenna Smith

User Scenarios

Feeling Unsafe

Feeling Unsafe

Going About Life

Going About Life

Planning a Ride

Planning a Ride

Bike Bump

Bike Bump

Early Exploration

Sketches & Lo Fi

Before moving into mid fidelity, we sketched dozens of cluster layouts and flows on paper. These lo-fi frames helped us explore states quickly and decide which ideas were worth refining.

Sketches

Sketch
Sketch
Sketch

Lo Fi HMI Frames

Lo-fi wireframe
Lo-fi wireframe
Lo-fi wireframe
Lo-fi wireframe
Lo-fi wireframe

Iterate

Mid Fidelity

This stage was defined by constant iteration. We moved rapidly between sketches, wireframes, and mid fidelity screens, pressure testing our four blue sky features: Pack Mode, Request Assistance, Bike Bump, and the Community Heatmap. Each concept went through multiple rounds of critique, user feedback, and refinement before earning its place in the final system.

HMIs

HMI mid-fi
HMI mid-fi
HMI mid-fi
HMI mid-fi
HMI mid-fi

Refinements

HMI refinement
HMI refinement
HMI refinement
HMI refinement
HMI refinement

Map layout

HMI map iteration
HMI map iteration
HMI map iteration
HMI map iteration
HMI map iteration

Carousel

HMI carousel iteration
HMI carousel iteration
HMI carousel iteration
HMI carousel iteration
HMI carousel iteration

Notifications

HMI notification iteration
HMI notification iteration
HMI notification iteration
HMI notification iteration
HMI notification iteration

Request Assistance

Request Assistance iteration
Request Assistance iteration
Request Assistance iteration
Request Assistance iteration
Request Assistance iteration

Boot-up

Boot-up animation frame
Boot-up animation frame
Boot-up animation frame
Boot-up animation frame
Boot-up animation frame
Boot-up animation frame

App

HondaConnect App

Mid fidelity for the companion app. Same iteration stage as the HMIs above; riders plan routes, discover events, and stay connected before and after the ride.

App mid-fi
App mid-fi
App mid-fi
App mid-fi
App mid-fi
App mid-fi

Architecture

System Flows

Detailed interaction flows for each core feature, ensuring minimal cognitive load while riding.

Request Assistance

Request Assistance flow

Going About Life

Going About Life flow

Bike Bump

Bike Bump flow

Zoning

Two layouts: driving (protected telltales) and user (flexible content windows).

Driving

Driving layout

Other Pages

Other pages layout

Final

Final high fidelity

Universal trip bar across all screens. Riders scroll key ride info using a single control input.

Universal Trip Window

High fi hero, universal trip
High-fi trip window screen
High-fi trip window screen
High-fi trip window screen
High-fi trip window screen
High-fi trip window screen

Notifications

High fi, notifications
High-fi notification screen
High-fi notification screen
High-fi notification screen
High-fi notification screen
High-fi notification screen

Pivotal decisions

We made key design choices along the way. Here are a few that shaped the final system.

Before

Before D-pad change

After

After D-pad change

We got rid of the TV remote paradigm and moved to a D-pad style for navigation.

Before

Before grid change

After

After grid change

We moved from a tick mark grid to a more dynamic grid. It moved better, simulated speed better, and felt more unique and interesting.

Before

Before media and pack change

Before

Before media and pack change

After

After media and pack change

After

After media and pack change

We got rid of the media page and added Pack Mode instead. Media now lives in the universal trip window so it can be accessed on any screen.

Features

Deep Dives

Pack Mode

Social Compass

Shows nearby riders, syncs navigation across a group, and enables spontaneous or planned ride coordination.

Pack Mode flow
Pack Mode hero bike and map

Request Assistance

Safety First

Share location with a preselected contact or call for help through voice commands; hands stay on the handlebars.

Request Assistance flow
Request Assistance
Request Assistance
Request Assistance

Community Heatmap

Discover Riders

Live map of nearby bikers, events, hotspots, and popular routes.

Community Heatmap

Bike Bump

Instant Connect

Tap phone to HMI to send a friend request. Turn a gas station encounter into a lasting connection.

Bike Bump

Exploration

Directions We Explored

Alongside the final system, we explored several directions that pushed how far the Rebel's cluster could go. These didn't make the first release due to time and scope, but they helped define the edges of what HondaConnect could become.

Voice Commands

Voice command exploration
Voice command exploration
Voice command exploration
Voice command exploration
Voice command exploration

We explored voice-driven interactions for hands-free control while riding.

First-Person Map View

First-person map exploration
First-person map exploration
First-person map exploration

We explored a first-person map perspective for in-ride context.

TV Dock & Remote

TV mode exploration
TV exploration 2
Media page replaced with pack mode

We explored a TV remote / docked system interface; we later dropped TV mode and the media page, moved media into the trip window, and replaced the media page with Pack Mode so the experience stays ride-focused.

Color Styles

Color exploration
Color exploration
Color exploration
Color exploration
Color exploration
Color exploration

We explored customizable color styles for the home screen, from more playful gradients to muted options that keep focus on the ride.

Ecosystem

HMI + App

The complete HondaConnect ecosystem, supporting the entire ride journey: before, during, and after.

HMI + App ecosystem
Honda Rebel with branding

Development Handoff

Design → Dev

Design to dev handoff

We worked closely with a developer to make sure every key part of the handoff landed at the right time, from flows and states to edge cases and interaction details. It was a big learning experience in translating design decisions into implementation, and it shifted my perspective on how engineers think about constraints, tradeoffs, and feasibility.

Live Prototype

Brought to Life

A developer built the prototype: they used a screen recording of an actual ride and mapped our HMI designs onto it so the ride and all the features we designed could be shown in context. We did not build the prototype ourselves; the demo brought our work to life.

Prototype road view
Prototype navigation
Prototype setup